Commit Graph

2 Commits

Author SHA1 Message Date
2e4f618947 Record completion of P6 main runs and the server move
- All protocol_bench main runs finished 30/10/2026 02:16 UTC: S1 560 train
  cells, S2 224 posteriors + 224 train cells, S3+S4+S8 384 train jobs.
  Summarize has not been run yet.
- docs/research/server-migration.md: the repository folder is synced as a
  whole to the new server; outputs/ stays out of git. Lists what is not in
  git and why it matters; unpushed_outputs.sha256 holds sha256 for all
  21,987 files under outputs/ to verify the sync.
- Plan §12 item 26, AGENTS.md status and next steps, report.html tasks and
  log, README supervisor note, bench-protocol status.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-30 02:18:20 +00:00
381b5ffb06 Add P6 benchmark code, locked protocol_bench, T2 study
- ml_porosity/benchmark/ runner, scripts 32-35, scripts/run_bench.sh;
  misspec= option in synth_d2 (default path reproduces P2r bit for bit).
- configs/protocol_bench.{yaml,sha256,lock.json} locked 29/10 14:39 UTC
  (sha256 aa763f0a...), configs/d2_synth_bench.yaml.
- T2 mechanism declaration and results; operations/p6_supervisor.py.
- Docs, report and paper edits of 29/10.

outputs/ stays out of git; the repository folder is synced as a whole to
the new server. Main S1 runs are still training at this commit.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-30 01:33:18 +00:00